Digital library of construction informatics and information technology in civil engineering and construction
 
ITC
Digital library
SciX
Tower of Babel
Home All papers Browse by series Browse by authors Browse by keywords Browse by years
Paper: w78-2011-Paper-129
Paper title: LOCATION-BASED MICRO-MILESTONES FAIR SUB-CONTRACTOR PAYMENT
Authors: R Kenley, T Harfield, C Ouyang
Summary: This paper introduces the new concept of location-based micro-milestones and argues for their use in achieving fair payment for subcontractors. It integrates location-based management (LBM) theory and Business Process Management (utilising YAWL: Yet Another Workflow Language) to illustrate how location-based BIMs can be utilised for the effective and fair payment systems. It outlines the rationale for linking LBM and YAWL methodologies to develop a BIM alternative solution to a traditional industry problem of late payment for sub-contractors. Location-Based Management methodologies are now available in the powerful scheduling and control software (Vico Office by Vico Software). Originally developed in Finland, it has now become part of the BIM movement through integration into 5D environments (3D + time + cost), using location-based quantity data (from 3D BIM) and location-based scheduling (4D). While LBM is being rapidly adopted in industry, expansion of theory in workflow knowledge based on data from real projects remains limited. YAWL has a well-established foundation based on concurrency theory and workflow patterns derived from research. It is informed by experiences with languages supported by contemporary BPM systems and it has a formal semantics. Linking these two methodologies could provide a BIM solution to the problem of late payment to sub-contractors. The YAWL support environment could be extended to provide a workable interface for auto-generating construction payment processes from digital models based on LBM defined micro-milestones. The visualisation of the YAWL interface and related workflows could be used to both inform the analysis and to communicate the results. This paper suggests a study to obtain proof of concept that LBM and YAWL can create an auto-generated certification and payment system for sub-contractors. Results could be configurable reference process models and workable prototype tools that trigger immediate payment of completed work according to the completion of location-based micro-milestones.
Type: conference paper
Year of publication: 2011
Keywords: Fair payment, location-based management, micro-milestone, BIM
Series: w78:2011
ISSN: 2706-6568
Download paper: /pdfs/w78-2011-Paper-129.pdf
Citation: R Kenley, T Harfield, C Ouyang (2011). LOCATION-BASED MICRO-MILESTONES FAIR SUB-CONTRACTOR PAYMENT. Proceedings of the 28th International Conference of CIB W78, Sophia Antipolis, France, 26-28 October (ISSN: 2706-6568), http://itc.scix.net/paper/w78-2011-Paper-129
hosted by University of Ljubljana University of Ljubljana

includes:

CIB
W78

ECCE

ITcon
© itc.scix.net
inspired by SciX, ported by Robert Klinc [2019]